MS Farming, Mhangura
Erect 5km 11kV line; construct 1×500kVA, 2×300kVA and 2×500kVA substations
Powerline construction · Zimbabwe
We design, erect, deviate and maintain medium- and high-voltage overhead lines for farms, mines, developers and industry, with protection systems and authorised high-voltage switching.
Each line is planned around your site, load and route, then built and tested by our own field team.
Our project record includes commercial farms, crocodile farms in Kariba, precast manufacturers, land developers and residential estates. Line lengths range from a few hundred metres to several kilometres.
Connection and approval steps depend on the project and the utility. We assess your site and scope first and explain what is needed. We do not promise approval timelines.



Project evidence
Erect 5km 11kV line; construct 1×500kVA, 2×300kVA and 2×500kVA substations
Deviate 2.6km of 11kV line
Erect 900m 11kV line and construct 1×200kVA substation
Erect 300m 33kV line and construct 200kVA substation
Deviate 0.7km 11kV line, construct 1km 11kV line and build 1×50kVA substation
Erect 0.7km 11kV line and construct 1×200kVA substation
Deviate 1.3km of 11kV line
Erect 700m 11kV line and construct 1×200kVA substation
Supply line gear, stay wire, insulators, PG clamps and stay sets
Construct 400m and maintain 200m MV lines
11kV line construction and 800kVA substation
11kV and MV line reticulation for Southland Land Developers
11kV line construction and 200kVA substation
Yes. Our completed projects include 11kV lines up to 5km long and 33kV line construction, and we design and install systems up to 132kV.
Yes. We carry out line deviations; recent examples include a 2.6km 11kV deviation in Mhangura and a 1.3km deviation in Beatrice.
Yes. We have built lines in Mhangura, Kariba, Goromonzi, Darwendale, Beatrice, Marondera and Chitungwiza.